WARNINGFailure to follow all of the manufacturer’sinstructions could result in hazardousfires, explosions, property damage, or serious personal injury
8Lighting the Second Burner•Turn the second control knob on the main control panel to the“HIGH” position. The unlit burner will automatically ignite.L
9SEAR ZONE OPERATING INSTRUCTIONS1. Follow all checking and lighting procedures of lighting main burners.2. Turn the infrared burner knob to HIGH posi
10•Turn all knobs to “OFF”•Open lid during lighting. Turn gas on at LP tank.•Push in and turn Rotisserie Burner knob to “HI”.•Push the Igniter. Be sur
11This model has a 12’ hose with a male coupling plug that will allow you to attach your barbecue to your residential gas line.WE STRONGLY RECOMMEND C
1212PARTS LISTING FOR85-1087-6 (PROPANE) (G61003)Item No. Quantity Specification Part No.A 1 Top Lid AssemblyAA 1 Top Lid Weldment G610-2100-01AB 2 H
131385-1087-6 (PROPANE) (G61003)
14PARTS LISTING FOR85-1088-4 (NATURAL GAS) (G61004)Item No. Quantity Specification Part No.A 1 Top Lid AssemblyAA 1 Top Lid Weldment G610-2100-01AB 2
1585-1088-4 (NATURAL GAS) (G61004)
161616#1 – 1/4” x 13 mm Screw (x6) #2 – Ø7 Flat Washer (x6)#4 – No.10 x 10 Screw (x6) #5 – Ø5 Flat Washer (x6)#6 – Ø5 Lock Washer (x6) #3 – Ø7 Lock Wa
1717CHEGEFBMBHBJBLAA1Assemble the left door (EG) to the cart as shown. Place the bottomdoor hinge into the hole located on the bottom shelf (EF). Then
i iT ABLE OF CONTENTSWarranty . . . . . . . . . . . . . . . . . iiInstallation Information . . . . . . 1Additional Warnings . . . . . . . . 1Use of
1818185Assemble the side burner shelf (DA) to the left side panel (EA) usinghardware #1, #2, and #3 (x3) and #4, #5, and #6 (x2). Assemble theside she
19196.3Using 3.0 self tapping screws (x4) (hardware number #8) attach theDigital System onto the side burner control panel as shown.Fig. 6.36.2Place t
206.4Place the Control panel sticker onto the Digital System as shown.Fig. 6.4Place the temperature probe into the holding clip located underthe Side
216.5The end user must connect the wire from the load cell to the bot-tom side of the digital system box.The 3 load cells are located under this plate
22EJEACBCG8Attach the side burner igniter wire (CG) as shown. Ensure the wireis pushed in at both ends correctly. Insert regulator (CB) throughthe hol
23BEDJACACACAD10Hang the smoker box (BE) under the warming rack (BN) using thehooks attached. 11Replacing Light batteriesFour D batteries are located
24
25DISTRIBUTOR Trileaf Distribution TrifeuilToronto, CanadaM4S 2B8
1ADDITIONAL WARNINGSINSTALLATIONINFORMATIONThe installation of this appliance must be in accordance with all local codes, or in theabsence of local co
2FILLING THE LP CYLINDER The cylinder must be filled prior to use and must have the air purged. For safety, followthese instructions when having your
3PRIOR TO USINGDrawing EDo not use your barbecue until you have carefully read and fully understand all the informationin this manual. Please ensure t
4SAFETY HOSE AND REGULATORPropane Gas Models: Your barbecue is designed to operate on L.P. (Propane) gas at apressure of 2.74 Kpa (11˝ water column).
5Drawing B Drawing CDrawing DSAFETYLEAK TESTINGPerform a “Leak Test”•Before lighting your barbecue for the first time.•Every time the cylinder is refi
6LIGHTINGTHE GRILLMake Sure you have followed all the safety checks, procedures and instructionsindicated in the previous section, before attempting t
76. Confirm that the burner is properly lit. If the flame pattern is other than normal, consult the Troubleshooting Guide for corrective action.7. Alw
Commentaires sur ces manuels